About us.
We add our craft to the strength of steel
Since 1998, we have been building safely worldwide in steel construction and heavy industry projects.
28+
Years of experience
85+
Completed projects
3
Ongoing project
55+
Provinces with projects
Who we are?
More than 28 years of field experience
Artifex Çelik is a subsidiary of NG Çelik Konstrüksiyon Ltd. Şti. and has specialised in steel construction and heavy industry projects since 1998.
We have taken part in many major projects, from airports and defence facilities to food plants and automated warehouses. In structural steel fabrication and erection, warehouse racking, panel cladding and prefabricated steel buildings, we manage every stage from planning to handover together with health & safety and quality control processes.
With our teams based in Afyonkarahisar, we mobilise quickly to sites worldwide and consistently deliver the quality and schedule we promise on every project.

1998
since

Our direction.
What we work for today, and where we want to be tomorrow
Our mission.
To be a leading partner in our industry with safe, innovative solutions to international standards.
- Erection to international standards on every project
- Health and safety with a zero-accident target
- Speed and efficiency through innovative methods
Our vision.
To be the benchmark for quality, speed and safety in steel erection in Türkiye.
- A reliable partner worldwide
- A wide range of projects from heavy industry to logistics
- Sustainable, long-lasting steel structures
Our journey.
From 1998 to today
From steel structures to transfer towers, from warehouses to airports: experience that has grown with steel over the years.

28+
years of field experience
1998
The beginning.
Our journey began in steel construction.
Over the years
Major structures.
We grew our experience with projects ranging from airports and hospitals to shopping centres and factories.
- Bodrum Airport
- TUSAŞ Subsonic Wind Tunnel
- Izmir Adnan Menderes Airport
- Sera Shopping Centre
- Kütahya City Hospital
- Kipa Shopping Centre
- Netlog Racking Installation
- Omsan Logistics Warehouse Racking
- Weber Plant
- Lezita Facilities
2015 – 2019
Racking and factory facilities.
We grew our field experience with high-bay racking and steel structures in food, pharmaceutical and logistics facilities.
- Unilever Plant
- Abalıoğlu Oil Plant, Yenifoça
- FNS Facility
- Pharmaceutical Plant Canteen Building
- MNG Kargo Warehouse
- SASA Facilities
2020 – 2022
Heavy industry and defence.
We worked on large-scale facilities in the cement, steel, automotive and defence industries.
- Samsun Tobacco Factory
- Kaptan Steel Plant
- Ford Otosan Spare Parts Plant
- ASELSAN MGEO
- Nuh Cement Plant
2023 – 2025
Integrated facilities.
We built high-bay warehouses and transfer towers in integrated food and tyre industry facilities.
- Çimsa Afyon Plant
- Petlas Transfer Towers
- Abalıoğlu Milk Powder Plant
- Sütaş Eastern Anatolia Integrated Facilities
Today
Still growing.
More than 28 years of experience, 85+ completed projects in 55+ provinces and a team that keeps growing.
- Ekol Logistics
- Aves Yağ ve Gıda Sanayi A.Ş.
- Özçınarlar Oksello Oil Plant

How we work?
A planned, transparent process from survey to handover
We approach every project with the same discipline: we define the scope, plan the site, carry out erection with quality control and hand over on time.
Survey & quote.
Project documents and site conditions are reviewed, and scope and schedule are defined.
Planning.
The erection method, crane plan, crew and equipment are defined, and a health & safety plan is prepared.
Erection.
Our experienced site crews carry out erection safely, with defined quality control points.
Handover.
The structure is handed over on time with final checks and documentation.
Our values.
The principles we bring to every project

Quality.
We apply rigorous inspection at every stage, from material selection to workmanship.
Integrity.
We build our relationships on transparency and trust.
Experience.
We bring the experience we have built in heavy industry projects since 1998 to every site.
Reliability.
We consistently deliver the quality and schedule we promise on every project.

Quality & safety.
Zero accidents on site, complete quality at handover
Fast erection only adds value when it is safe and controlled. On every project we manage safety and quality from start to finish.
Safety plan
Each project starts with a risk assessment and a site-specific health and safety plan.
Trained crews
Erectors, welders and operators work in trained crews, and the site is continuously supervised.
Controlled erection
Erection is carried out step by step with predefined quality control points.
Connection checks
Torque and weld checks are performed on bolted and welded connections.
Documented handover
Final checks are completed and the structure is handed over on time with its documentation.
Sectors.
Different sectors, the same care
From airports to hospitals, from food plants to automated warehouses: steel solutions tailored to the specific needs of each sector.

Aviation.
- Bodrum Airport
- Izmir Adnan Menderes Airport
Defence industry.
- ASELSAN MGEO
- TUSAŞ Subsonic Wind Tunnel
Automotive & tyres.
- Ford Otosan Spare Parts Plant
- Petlas Transfer Towers
Food.
- Sütaş Eastern Anatolia Integrated Facilities
- Abalıoğlu Milk Powder Plant
- Unilever Plant
Logistics & storage.
- Netlog Racking Installation
- Omsan Logistics Warehouse Racking
Heavy industry.
- Kaptan Steel Plant
- Nuh Cement Plant
- Weber Plant
Healthcare.
- Kütahya City Hospital
Retail.
- Sera Shopping Centre
- Kipa Shopping Centre

Our head office.
From Afyonkarahisar to every corner of the world
From our head office, our teams have delivered projects in 5 countries so far – in Türkiye alone, our work spans 55+ provinces.
Address
Zafer Mah. Ahmet Özyurt Cd. No:123, 03370 İhsaniye / AFYONKARAHİSAR
- Türkiye
- Azerbaijan
- Syria
- Iran
- Russia
Get a quote for your project.
Share your project details; our team will review the scope and get back to you as soon as possible.
- Survey & quote
- Planning
- Erection
- Handover