Skip to content
Artifex Çelik
Red steel transfer tower being set in place by crane

Petlas Transfer Towers.

Structural Steel Fabrication & Erection

Completed2025Kırşehir

At Petlas Transfer Towers (Kırşehir), Artifex Çelik's site teams completed the Structural Steel Fabrication & Erection works.

Project photos.

6 photos · straight from the site

  • Red steel transfer tower being set in place by crane
  • Steel columns erected at the Petlas plant with beams waiting on site
  • Erection work on a transfer tower using a boom lift
  • Welder working on a steel lattice member on site
  • Conveyor lines and steel members lowered on site at the Petlas plant
  • Building frame rising with steel columns and beams

More of our projects.

Our other Structural Steel Fabrication & Erection work

All projects
  • Hard-hat team on the Aves site in Amasya with the plant foundations rising
    Ongoing2026 – ongoing

    Amasya

    Aves Yağ ve Gıda Sanayi A.Ş.

    Racking Installation · Structural Steel Fabrication & Erection · Panel Cladding · 750 t ASRS racking

  • Steel roof frame being erected with a mobile crane
    Ongoing2026 – ongoing

    Kütahya

    Özçınarlar Oksello Oil Plant

    Structural Steel Fabrication & Erection · Panel Cladding

  • Steel columns being erected by crane at the Kaptan Demir Çelik plant
    Completed2021 – 2023

    Tekirdağ

    Kaptan Steel Plant

    Structural Steel Fabrication & Erection · Panel Cladding

Get a quote for your project.

Share your project details; our team will review the scope and get back to you as soon as possible.

  1. Survey & quote
  2. Planning
  3. Erection
  4. Handover